Filton® Rotary C.B.N. Union - High Temperature
(Sizes 1-1/2" to 6")
Flow Capacity
Nominal Size | Rotary C.B.N. Union |
Water(ii) | Steam (iii) kg/h |
Air (iv) m3/h |
|
---|---|---|---|---|---|
m3/h | l/m | ||||
40 (1-1/2") | B.E. | 10.4 | 173 | 381 | 364 |
S.T. / R.S. | 3.8 | 63 | 151 | 135 | |
50 (2") | B.E. | 19.5 | 325 | 717 | 684 |
S.T. / R.S. | 6.3 | 105 | 357 | 215 | |
65 (2-1/2") | B.E. | 30.5 | 508 | 1120 | 1069 |
S.T. / R.S. | 10.8 | 180 | 547 | 376 | |
80 (3") | B.E. | 41.6 | 693 | 1524 | 1455 |
S.T. / R.S. | 14.9 | 248 | 807 | 511 | |
90 (3-1/2") | B.E. | 57.0 | 950 | 2091 | 1996 |
S.T. / R.S. | 23.4 | 390 | 942 | 818 | |
100 (4") | B.E. | 76.6 | 1227 | 2807 | 2679 |
S.T. / R.S. | 27.6 | 460 | 982 | 937 | |
125 (5") | B.E. | 112.2 | 1870 | 4859 | 4639 |
S.T. / R.S. | 45.3 | 755 | 1617 | 1544 | |
150 (6") | B.E. | 166.3 | 2772 | 6997 | 6680 |
S.T. / R.S. | 73.7 | 1228 | 2862 | 2760 |
(ii) Flow measured in cubicmetres/hour at a velocity of 3 metres/second. (Also applies to other liquids.)
(iii) Flow in kilograms/hour at a velocity of 30 metres/secondand a pressure of 6 bar.
(iv) Flow in cubic metres/hour free air at a velocity of 15 metres/second and a pressure of 6 bar.
Name | Model | Left or Right | Nominal Size | Nominal Size in Inches | Style | Price | hf:att:pa_model | hf:att:pa_left-or-right | hf:att:pa_nominal-size | hf:att:pa_nominal-size-inches | hf:att:pa_style |
---|---|---|---|---|---|---|---|---|---|---|---|
15471-L | C.B.N. Union | L | 50 | 2 | B.E. | $3,172.81 | cbn-union | l | 50 | 2 | b-e |
15471-R | C.B.N. Union | R | 50 | 2 | B.E. | $3,172.81 | cbn-union | r | 50 | 2 | b-e |
15471G-R | C.B.N. Union | R | 50 | 2 | B.E. | $3,172.81 | cbn-union | r | 50 | 2 | b-e |
15472-L | C.B.N. Union | L | 50 | 2 | S.T. | $3,041.49 | cbn-union | l | 50 | 2 | s-t |
15472-R | C.B.N. Union | R | 50 | 2 | S.T. | $3,041.49 | cbn-union | r | 50 | 2 | s-t |
15473-L | C.B.N. Union | L | 50 | 2 | R.S. | $3,398.69 | cbn-union | l | 50 | 2 | r-s |
15473-R | C.B.N. Union | R | 50 | 2 | R.S. | $3,398.69 | cbn-union | r | 50 | 2 | r-s |
15477-L | C.B.N. Union | L | 80 | 3 | B.E. | $7,538.06 | cbn-union | l | 80 | 3 | b-e |
15477-R | C.B.N. Union | R | 80 | 3 | B.E. | $7,538.06 | cbn-union | r | 80 | 3 | b-e |
15478G-L | C.B.N. Union | L | 80 | 3 | S.T. | $7,926.78 | cbn-union | l | 80 | 3 | s-t |
15478G-R | C.B.N. Union | R | 80 | 3 | S.T. | $7,926.78 | cbn-union | r | 80 | 3 | s-t |
15479-L | C.B.N. Union | L | 80 | 3 | R.S. | $8,646.44 | cbn-union | l | 80 | 3 | r-s |
15479-R | C.B.N. Union | R | 80 | 3 | R.S. | $8,646.44 | cbn-union | r | 80 | 3 | r-s |
16171-L | C.B.N. Union | L | 90 | 3-1/2 | B.E. | $11,236.17 | cbn-union | l | 90 | 3-1-2 | b-e |
16171-R | C.B.N. Union | R | 90 | 3-1/2 | B.E. | $11,236.17 | cbn-union | r | 90 | 3-1-2 | b-e |
16172-L | C.B.N. Union | L | 90 | 3-1/2 | S.T. | $11,787.12 | cbn-union | l | 90 | 3-1-2 | s-t |
16172-R | C.B.N. Union | R | 90 | 3-1/2 | S.T. | $11,787.12 | cbn-union | r | 90 | 3-1-2 | s-t |
16173-L | C.B.N. Union | L | 90 | 3-1/2 | R.S. | $12,701.45 | cbn-union | l | 90 | 3-1-2 | r-s |
16173-R | C.B.N. Union | R | 90 | 3-1/2 | R.S. | $12,701.45 | cbn-union | r | 90 | 3-1-2 | r-s |
16174-L | C.B.N. Union | L | 100 | 4 | B.E. | $11,477.81 | cbn-union | l | 100 | 4 | b-e |
16174-R | C.B.N. Union | R | 100 | 4 | B.E. | $11,477.81 | cbn-union | r | 100 | 4 | b-e |
16175-L | C.B.N. Union | L | 100 | 4 | S.T. | $12,901.37 | cbn-union | l | 100 | 4 | s-t |
16175-R | C.B.N. Union | R | 100 | 4 | S.T. | $12,901.37 | cbn-union | r | 100 | 4 | s-t |
16176-R | C.B.N. Union | R | 100 | 4 | R.S. | $13,353.13 | cbn-union | r | 100 | 4 | r-s |
18101-L | C.B.N. Union | L | 40 | 1-1/2 | B.E. | $2,411.13 | cbn-union | l | 40 | 1-1-2 | b-e |
18101-R | C.B.N. Union | R | 40 | 1-1/2 | B.E. | $2,411.13 | cbn-union | r | 40 | 1-1-2 | b-e |
18102-L | C.B.N. Union | L | 40 | 1-1/2 | S.T. | $2,489.92 | cbn-union | l | 40 | 1-1-2 | s-t |
18102-R | C.B.N. Union | R | 40 | 1-1/2 | S.T. | $2,489.92 | cbn-union | r | 40 | 1-1-2 | s-t |
18103-L | C.B.N. Union | L | 40 | 1-1/2 | R.S. | $2,736.81 | cbn-union | l | 40 | 1-1-2 | r-s |
18103-R | C.B.N. Union | R | 40 | 1-1/2 | R.S. | $2,736.81 | cbn-union | r | 40 | 1-1-2 | r-s |
18103G-L | C.B.N. Union | L | 40 | 1-1/2 | R.S. | $2,736.81 | cbn-union | l | 40 | 1-1-2 | r-s |
18103G-R | C.B.N. Union | R | 40 | 1-1/2 | R.S. | $2,736.81 | cbn-union | r | 40 | 1-1-2 | r-s |
18240-L | C.B.N. Union | L | 65 | 2-1/2 | B.E. | $6,119.75 | cbn-union | l | 65 | 2-1-2 | b-e |
18240-R | C.B.N. Union | R | 65 | 2-1/2 | B.E. | $6,119.75 | cbn-union | r | 65 | 2-1-2 | b-e |
18240G-R | C.B.N. Union | R | 65 | 2-1/2 | B.E. | $6,119.75 | cbn-union | r | 65 | 2-1-2 | b-e |
18241-L | C.B.N. Union | L | 65 | 2-1/2 | S.T. | $6,487.46 | cbn-union | l | 65 | 2-1-2 | s-t |
18241-R | C.B.N. Union | R | 65 | 2-1/2 | S.T. | $6,487.46 | cbn-union | r | 65 | 2-1-2 | s-t |
18242-L | C.B.N. Union | L | 65 | 2-1/2 | R.S. | $7,359.45 | cbn-union | l | 65 | 2-1-2 | r-s |
18242-R | C.B.N. Union | R | 65 | 2-1/2 | R.S. | $7,359.45 | cbn-union | r | 65 | 2-1-2 | r-s |
18242G-R | C.B.N. Union | R | 65 | 2-1/2 | R.S. | $7,359.45 | cbn-union | r | 65 | 2-1-2 | r-s |