Filton® Rotary R.E.B. Union
(Sizes 1-1/2" to 6")
Installation Procedures
- A suitable run-in period before fitting is recommended. Rotate the R.E.B. at 50 r.p.m. for 1 hour for sizes ranging from 40 (1-1/2”) to 80 (3”) and at 25 r.p.m. for 2 hours for all other sizes above.
- Add system liquid if seals squeak.
- A torque arrestor may be fitted, but this must not restrict the rotary union.
- Ensure that the spindle thread is RH or LH to suit the direction of rotation of the machine shaft.
- If the machine shaft reverses direction of rotation, securely lock the spindle or (preferably) use a flanged connection.
- DO NOT fix valves etc. directly on to the rotary union.
- DO NOT connect with rigid pipe.
- DO NOT clamp the rotary union.
Maximum Length For Flexible Hose
Nominal Size | LENGTH (mm) | PART NUMBER |
---|---|---|
40 (1-1/2") | 460 | M.240/7 |
50 (2") | 610 | M.240/8 |
65 (2-1/2") | 610 | M.240/9 |
80 (3") | 760 | M.240/10 |
90 (3-1/2") | 760 | M.240/10 |
100 (4") | 915 | M.240/11 |
125 (5") | 915 | M.240/12 |
150 (6") | 915 | M.240/13 |
Name | Model | Left or Right | Nominal Size | Nominal Size in Inches | Style | Price | hf:att:pa_model | hf:att:pa_left-or-right | hf:att:pa_nominal-size | hf:att:pa_nominal-size-inches | hf:att:pa_style |
---|---|---|---|---|---|---|---|---|---|---|---|
17238-L | R.E.B. Union | L | 50 | 2 | S.T. | $3,267.37 | reb-union | l | 50 | 2 | s-t |
17238-R | R.E.B. Union | R | 50 | 2 | S.T. | $3,267.37 | reb-union | r | 50 | 2 | s-t |
17238G-L | R.E.B. Union | L | 50 | 2 | S.T. | $3,193.82 | reb-union | l | 50 | 2 | s-t |
17238G-R | R.E.B. Union | R | 50 | 2 | S.T. | $3,193.82 | reb-union | r | 50 | 2 | s-t |
17263-L | R.E.B. Union | L | 80 | 3 | R.S. | $7,753.43 | reb-union | l | 80 | 3 | r-s |
17263-R | R.E.B. Union | R | 80 | 3 | R.S. | $7,753.43 | reb-union | r | 80 | 3 | r-s |
17263G-R | R.E.B. Union | R | 80 | 3 | R.S. | $7,753.43 | reb-union | r | 80 | 3 | r-s |
17265-L | R.E.B. Union | L | 80 | 3 | B.E. | $6,450.68 | reb-union | l | 80 | 3 | b-e |
17265-R | R.E.B. Union | R | 80 | 3 | B.E. | $6,450.68 | reb-union | r | 80 | 3 | b-e |
17266-L | R.E.B. Union | L | 80 | 3 | S.T. | $6,912.95 | reb-union | l | 80 | 3 | s-t |
17266-R | R.E.B. Union | R | 80 | 3 | S.T. | $6,912.95 | reb-union | r | 80 | 3 | s-t |
17350-L | R.E.B. Union | L | 50 | 2 | B.E. | $3,041.49 | reb-union | l | 50 | 2 | b-e |
17350-R | R.E.B. Union | R | 50 | 2 | B.E. | $3,041.49 | reb-union | r | 50 | 2 | b-e |
17350G-L | R.E.B. Union | L | 50 | 2 | B.E. | $3,041.49 | reb-union | l | 50 | 2 | b-e |
17350G-R | R.E.B. Union | R | 50 | 2 | B.E. | $3,041.49 | reb-union | r | 50 | 2 | b-e |
17351-L | R.E.B. Union | L | 50 | 2 | R.S. | $3,445.97 | reb-union | l | 50 | 2 | r-s |
17351-R | R.E.B. Union | R | 50 | 2 | R.S. | $3,445.97 | reb-union | r | 50 | 2 | r-s |
17351G-R | R.E.B. Union | R | 50 | 2 | R.S. | $3,530.02 | reb-union | r | 50 | 2 | r-s |
17421-L | R.E.B. Union | L | 90 | 3-1/2 | B.E. | $14,146.33 | reb-union | l | 90 | 3-1-2 | b-e |
17421-R | R.E.B. Union | R | 90 | 3-1/2 | B.E. | $14,146.33 | reb-union | r | 90 | 3-1-2 | b-e |
17422-L | R.E.B. Union | L | 90 | 3-1/2 | S.T. | $15,149.65 | reb-union | l | 90 | 3-1-2 | s-t |
17422-R | R.E.B. Union | R | 90 | 3-1/2 | S.T. | $15,149.65 | reb-union | r | 90 | 3-1-2 | s-t |
17423-L | R.E.B. Union | L | 90 | 3-1/2 | R.S. | $15,585.65 | reb-union | l | 90 | 3-1-2 | r-s |
17423-R | R.E.B. Union | R | 90 | 3-1/2 | R.S. | $15,585.65 | reb-union | r | 90 | 3-1-2 | r-s |
17424-L | R.E.B. Union | L | 100 | 4 | B.E. | $14,146.33 | reb-union | l | 100 | 4 | b-e |
17424-R | R.E.B. Union | R | 100 | 4 | B.E. | $14,146.33 | reb-union | r | 100 | 4 | b-e |
17425-L | R.E.B. Union | L | 100 | 4 | S.T. | $15,070.86 | reb-union | l | 100 | 4 | s-t |
17425-R | R.E.B. Union | R | 100 | 4 | S.T. | $15,070.86 | reb-union | r | 100 | 4 | s-t |
18104-L | R.E.B. Union | L | 40 | 1-1/2 | B.E. | $2,327.08 | reb-union | l | 40 | 1-1-2 | b-e |
18104-R | R.E.B. Union | R | 40 | 1-1/2 | B.E. | $2,327.08 | reb-union | r | 40 | 1-1-2 | b-e |
18104G-L | R.E.B. Union | L | 40 | 1-1/2 | B.E. | $2,327.08 | reb-union | l | 40 | 1-1-2 | b-e |
18104G-R | R.E.B. Union | R | 40 | 1-1/2 | B.E. | $2,327.08 | reb-union | r | 40 | 1-1-2 | b-e |
18105-L | R.E.B. Union | L | 40 | 1-1/2 | S.T. | $2,447.90 | reb-union | l | 40 | 1-1-2 | s-t |
18105-R | R.E.B. Union | R | 40 | 1-1/2 | S.T. | $2,447.90 | reb-union | r | 40 | 1-1-2 | s-t |
18105G-L | R.E.B. Union | L | 40 | 1-1/2 | S.T. | $2,447.90 | reb-union | l | 40 | 1-1-2 | s-t |
18105G-R | R.E.B. Union | R | 40 | 1-1/2 | S.T. | $2,447.90 | reb-union | r | 40 | 1-1-2 | s-t |
18106-L | R.E.B. Union | L | 40 | 1-1/2 | R.S. | $2,642.26 | reb-union | l | 40 | 1-1-2 | r-s |
18106-R | R.E.B. Union | R | 40 | 1-1/2 | R.S. | $2,642.26 | reb-union | r | 40 | 1-1-2 | r-s |
18106G-L | R.E.B. Union | L | 40 | 1-1/2 | R.S. | $2,642.26 | reb-union | l | 40 | 1-1-2 | r-s |
18106G-R | R.E.B. Union | R | 40 | 1-1/2 | R.S. | $2,642.26 | reb-union | r | 40 | 1-1-2 | r-s |
18131-L | R.E.B. Union | L | 65 | 2-1/2 | B.E. | $5,279.27 | reb-union | l | 65 | 2-1-2 | b-e |
18131-R | R.E.B. Union | R | 65 | 2-1/2 | B.E. | $5,279.27 | reb-union | r | 65 | 2-1-2 | b-e |
18131G-L | R.E.B. Union | L | 65 | 2-1/2 | B.E. | $5,279.27 | reb-union | l | 65 | 2-1-2 | b-e |
18132-L | R.E.B. Union | L | 65 | 2-1/2 | S.T. | $5,526.16 | reb-union | l | 65 | 2-1-2 | s-t |
18132-R | R.E.B. Union | R | 65 | 2-1/2 | S.T. | $5,526.16 | reb-union | r | 65 | 2-1-2 | s-t |
18133-L | R.E.B. Union | L | 65 | 2-1/2 | R.S. | $6,182.78 | reb-union | l | 65 | 2-1-2 | r-s |
18133-R | R.E.B. Union | R | 65 | 2-1/2 | R.S. | $6,182.78 | reb-union | r | 65 | 2-1-2 | r-s |
18133G-R | R.E.B. Union | R | 65 | 2-1/2 | R.S. | $6,182.78 | reb-union | r | 65 | 2-1-2 | r-s |